<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
<title>Boiler Repair, ASME Shop Fabrication, Structural Erection, Mechanical Installation - Monarch Welding &amp; Engineering, Inc. Bay City Michigan</title>
<meta name="keywords" content="Boiler Repair, ASME Shop Fabrication, Structural Erection, Mechanical Installation">
<meta name="description" content="Projects that include boiler repair, ASME shop fabrication, structural erection, and mechanical installation completed by Monarch Welding & Engineering, Inc.">
<meta http-equiv="Content-Type" content="text/html; charset=iso-8859-1">
<style type="text/css">BODY,TD,DIV,B,P{

	font-family : Arial, Helvetica, sans-serif;

	font-size:12px;

}h1 {font-family:times new roman}body {
	margin-left: 0px;
	margin-top: 0px;
}
</style>
</head>

<body>
<table width="100%"  border="0" cellspacing="0" cellpadding="0">
  <tr>
    <td width="460"><img src="header.gif" alt="Monarch" width="460" height="133"></td>
    <td><h1 style="color:#87708F;padding-left:10px;">Welding<br>
      &amp; Engineering, Inc
</font></h1></td>
  </tr>
  <tr align="center" bgcolor="#EEE6EE">
    <td colspan="2"><h3>1566 Tech Park Dr., Bay City, MI 48706 | Office 989.684.3400 | Fax 989.684.0344</h3>
      <h2><b style="color:#87708F">Boiler Repair * ASME Shop Fabrication * Structural Erection * Mechanical Installation</b></h2></td>
  </tr>
  <tr>
    <td rowspan="2" valign="top" bgcolor="#EEE6EE"><p align="right"><img src="waterwall.jpg" alt="Waterwall tubes" width="209" height="145" hspace="15" align="right">Removed and replaced more<br>
         
      than 3,000 waterwall tubes and <br>
        more than 40 super heater tubes<br>
      	in auxiliary buildings.<br clear="all">
      <img src="karn.jpg" alt="Karn Unit 3 cooling tower" width="172" height="258" hspace="15" align="left"><br>
      </p>
      <p align="right">&nbsp;</p>
      <p align="left">Rebuilt Karn Unit 3 cooling <br>
      towers and added four <br>
      additional cells.<br clear="all">
      <p><img src="pipe.jpg" alt="Gas pipe installation" width="180" height="191" hspace="15" align="left"></p>
      <p>Installed more than 1,000 feet<br>
      of 3D-inch gas pipe, from the <br>
        Metering and Regulating station<br>
         to the Karn 3 &amp; Karn 4 burner decks<br>
      <br clear="all">

      <p><img src="burners.jpg" alt="Oil Burners" width="288" height="201" hspace="15" align="right"></p>
      <p>&nbsp;</p>
      <p>        Removed and replaced <br>
        30 oil burners with <br>
        new dual oil and gas<br>
         burners in Karn Unit 3<br>
         & Karn Unit 4
<br clear="all">
      <br>

      </p></td>
    <td valign="top"><p align="right" style="margin-left:15px;margin-right:10px;"><a href="http://www.bayareaassn.com" style="font-family:arial;color:#0066CC"><strong>Return to Bay Area Association</strong></a></p>
      <p align="justify" style="margin-left:15px;margin-right:10px;">
        &nbsp;&nbsp;&nbsp;&nbsp;&nbsp;The job took some 120 piping tradesmen,
        working for Bay City's Monarch Welding, putting in 50,000 hours to perform
        the mechanical services. Thirty massive burners firing the boilers were
        also installed, tied into the existing system and arranged in a towering
        three-story configuration by the piping tradesmen. The project also
        involved installation of a 48-inch manifold to route gas through three
        pipelines, plus the lying of more than 1,000 feet of 30 and lO-inch
        pipelines. &quot;The new 
      gas-fired units will produce power about 10% of the time, mostly at peak
        electrical use periods during the hottest and coldest days of the year.&quot; The
        newly renovated units can generate a combined 1,276 kilowatts of energy,
        which is enough to handle the power needs of a city of 835,000 people.</p>
      <p align="center" style="margin-left:15px;"><img src="control.jpg" alt="burner and boiler control system" width="273" height="187"><br>
        Installed a new burner and boiler <br>
        control         system in         the control room.</p>
      <p style="margin-left:15px;"><img src="manifold.jpg" alt="gas manifold" width="182" height="262" hspace="15" align="left"></p>
      <p style="margin-left:15px;">Constructed a 48-inch<br>
         gas manifold. Gas<br>
         supply lines tie-in 
        <br>
        and supply gas to 
        <br>
        four boilers.
        </td>
  </tr>
  <tr>
    <td align="right" valign="bottom"><div align="right">
        <p align="left"style="margin-left:15px;"><br>
          Member of:<br>
          <a href="http://www.bayareaassn.com/">Bay Area Association of the Plumbing &amp; Mechanical
   		      Contractors</a><br>
           Plumbers &amp; Steamfitters Local 85<br>
        Industry Steering Committee
<br>
        Local 85 Substance Abuse Program<br>
        Saginaw Valley Power Plant Engineers' Club<br>
        American Sugar Alliance</p>
        <p><img src="map-top.gif" width="128" height="126"></p>
      </div></td>
  </tr>
  <tr align="center" bgcolor="#339966">
    <td colspan="2" valign="top"><span
  class=GramE><strong><a href="http://www.bayareaassn.com" style="color:#333399;font-family:Arial Narrow">BAY AREA ASSOCIATION OF THE MICHIGAN
  PLUMBING AND MECHANICAL CONTRACTORS, INC.</a></strong></span></td>
  </tr>
  <tr align="right">
    <td colspan="2" valign="top"><img src="map-bottom.gif" alt=" " width="116" height="12"></td>
  </tr>
  
</table>


</body>
</html>

